Rapporter fra NorthPestClean perioden 2011-2014
2014
- 2014-07-03 Bæredygtighedsvurdering af løsningsalternativer for Høfde 42
- 2014-07-02 Final report_version 3 incl Appendix
- 2014-07-02 Skitseprojekt Høfde 42 incl appendix
- 2014-06-25 Remediation Stop Criteria report June 2014 incl appendix
2013
- 2013-12-06 Høfde 42 afgrænsning af nedsivningsområde
- 2013-11-06 Status report Cycle 2
- 2013-09-18 Surface tension measurements of 02-09-2013 field samples
- 2013-07-15 Memo presenting surface tension measurements of Groyne 42 water samples
- 2013-06-19 Høfde 42 Tilklogning Rapport
- 2013-06-06 Memo summarizing the results of ethoxylate surfactant batch tests with Groyne 42 soil
- 2013-03-22 Notat om drift af recirkulationsboringer
2012
- 2012-10-31 Status report Cycle 1
- 2012-09-24 Notat om design af Vibrationstest
- 2012-08-01 Dissemination report
- 2012-03-14 Environmental risk assessment -Phase A report
- 2012-02-12 Initial characterization
2011